HBF Stadium Accessible Lift Installation

AS PART OF A PROGRAMME OF CONTINUAL IMPROVEMENT, VENUES WEST HOW MANAGE HBF STADIUM REQUIRED THE DESIGN AND CONSTRUCT OF A NEW MULTI-STOP LIFT INSTALLATION TO FACILITATE ACCESSIBLE MOVEMENT THROUGH THE FACILITY AND MEET COMPLIANCE REQUIREMENTS.

Features of this project include:

  • Complete the design work for the new lift shaft, incorporating a five stop lift with glazed shaft lining.
  • Provide a cost-effective approach in maintaining access and operations of the facility across multiple levels with multiple tenant stakeholders and general public.
  • Demolish structural elements of the building, and construct new concrete suspended walkway bridges to the upper level of the building.
  • Undertake modifications to the existing theatre on the lower ground floor, including alterations to the tiered seating and entry.
  • Construct a new lift over run structure above the existing roof line for the new lift installation.

Client

HBF Stadium, Mt Claremont (Venues West)

Project Designer

Donaldson Boshard

Services Consultant

Forth Consulting, Schindler Lifts